Please read the articles to learn how to set up and use the Monitoring List feature.
Please find below specifications
Roadmap
- Early september 2024: Validation by the working group
- September 2024 : Technical study and workload estimation
- October 2024 : Developement
- January 2025 : Testing
- February 2025 : DEPLOYEMENT IN PROD
Presentation
The IDA Monitoring List (ML) facilitates the tracking of changes that occurs in a selection of audiovisual Works and for a selection of fields.
This feature aims to provide CMOs with extended logs (that includes IPI changes) on a selection of Works.
The Monitoring List feature is an enhancement that will also benefit to CMOs, who currently rely on the existing daily log feature to update their IT system.
At last, the Monitoring List, is managed at the CMO level. Every user within a society can access the Monitoring List.
The Team
The Work Group: UPdate IT Systems – Monitoring List team, is composed of representatives of
- SACD – Sandrine Sandova
- SIAE – Pina Ciani,
- SSA – Carlo Capozzi
- Suissimage – Martin Hettich
- The IDA Team.
Latest news
- The team has held 10 working sessions over a period of 9 months, starting in late September 2020.
- The Work Group Members has started the 1st testing phase in late May 2021 and we are now in the 4th batch testing period (as of March 2022).
- We have discovered at the deployment of the 3rd batch that there were a misunderstanding on the by default meaning. However, and since we are working in a agile manner, we shall correct this before the launch in production.
- The working group was relaunched in June 2024, and the specifications were established during the summer of 2024.
- The development started in October 2024.
- The testing phase started in January 2025.
- The Monitoring List was deployed on the production platform in February 2025.